SECMAPTEC

Communication room / design study

Understand the room.
See the finish-out.

Start with the proposed finish-out. Compare it with the captured room, explore all 37 original notes, and review the components behind the design.

IDF Remediation · Revision 08 · Public candidateExplore the room
Proposed IDF completion with rack, access control, tray and cooling

Rotate, zoom, and compare both model states.

Captured room / remediation scopeInteractive model ready to load

37 original tags / R08 geometry review

Compare the notes with the room.

Choose a tag to read its original note and locate it in either model. A modeled concept can still carry survey and engineering items.

Loading source notes…

Independent design locations

Locate the supporting components.

Five authored locations cover the gateway, recorder, room camera and two light fixtures. These are separate from the 37 original Matterport notes; products and procurement quantities await owner approval.

Explore the completed-room concept

The full scope, visible.

Explore the proposed room and its coordinated components. Source icons retain their Matterport colours; gold and cyan guides appear when Dimensions / scope is enabled. Product selections and surveys remain open.

Source-colour note icons / groupsProposed route / scope guidesSaved measurement guidesRack / access scope
Room length · saved SCAN
4.864 m
Room width · saved SCAN
2.181 m
Ceiling height · viewer estimate
3.003 m
Tray route · saved PLAN
2.070 m
Design basis and concept assumptions

Room dimensions and the C1 footprint follow saved Matterport annotations. Tray size and height, rack height, equipment selection, cable drops, and finish materials are illustrative concept choices. The reference tour supplies proposed security locations; 24 workstations, six Wi-Fi points, an additional IDF camera and equipment capacities are concept assumptions. The rack front is open and the near-side panel is hidden for review. Facility door cables enter the access enclosure through a separate straight 2-inch metal conduit into the ceiling. The proposed tray has a clearance offset around this riser; saved viewer guides remain unchanged. Legacy removal follows circuit identification and accepted cutover. The existing white enclosure stays visible as unresolved retention context; the retained-services control can hide it for a released-condition study. C2 is optional and off by default.

Cooling uses an authored Vertiv CoolPhase Wall WLM030A reference in the 3.5 kW class, at the published 915 × 390 × 490 mm dimensions. The proposal moves it from the narrow west candidate zone to the clear south wall for 600 mm side/front service space. The original source pin stays in place. Heat load, final capacity, outdoor condenser, refrigerant route and charge, drainage discharge/slope and electrical design remain open. Temperature and water probes do not display live readings. All 37 original notes are available above.

The clean completion model replaces the captured surfaces for presentation; it does not change the retained existing-condition scan. It is a modeled design concept, not a photograph of completed work or a construction specification.

Designed around a facility

Office. Security. Access.

The Pre-DEMO/RENO reference tour ↗ contains six proposed camera points, five proposed reader zones and a rear-exit monitoring point. This closet concept supports those uses, with an assumed office and Wi-Fi load.

View the facility service concept ↗

Workstations · concept
24 × 2 drops
Camera connections · concept
7 6 facility + IDF
Wi-Fi points · concept
6
Network connections · concept
64 of 96 ports
Access-control capacity
8 door channels
Security recording capacity
16 channel concept

Fifteen public-lane study views use simplified original board artwork. The interactive model stays orthographic; internal full-quality documentation remains separate.

Public candidate · prepared for review · publication is not authorized.